With much of the tunnel work already
underway, TCI was assigned the task of developing the specification
for complete coverage of the Motorway, and then managing the
site design and construction.
This motorway required 10km of road
to have coverage on four cellular platforms. Two systems were
designed, the first being for in tunnel coverage and this
section required over 4km of radiating cable fixed to the
tunnel roof. The in-tunnel coverage necessitated a world first
in carrier combining which TCI worked closely with RFS to
develop. The second half of the coverage utilised 5km of optic
fibre-fed technology, and like the radiating cable, all the
technical specifications were developed in-house by TCI for
each carrier.
|
|
 |
|