TCI's client required a Frequency Shifting Repeater (FSR) site to be deployed at a remote location named ‘Halfway Creek’.

The site was quite some distance from the existing power supply and adjoining landowners objected to power being brought to the site across their properties.

As a result, TCI recommended that the site be solar powered, undertook a solar design criteria analysis, then managed the procurement and installation of the solar equipment at the same time as designing and constructing the regular site elements.